Chennai Metro Lines

Metro Line Length (Km) Starting Point – End Point
Blue 23.1 Washermanpet – Chennai International Airport
Green 22 Chennai Central Railway Station – St Thomas Mount

How many metro trains are there in Chennai?

Specifically, in the Construction and Network sections.

Overview
Locale Chennai, Tamil Nadu, India
Transit type Rapid Transit
Number of lines 2 (operational), 3 (under construction)
Number of stations 42

Who started metro project in Chennai?

It is a Joint Venture project of Government of India and Government of Tamil Nadu with equal equity holding. The Government of Tamil Nadu have given in principle approval for the two initial corridors on 7-11-2007. The Government of India have approved the Chennai Metro Rail project on 28-1-2009.

Who funded Chennai Metro?

SIGNING OF LOAN AGREEMENT WITH GOVERNMENT OF JAPAN Balance amount funded by Central and State Governments together contributed about 43%. The loan agreement between the Government of India and the Government of Japan was signed on 31.03. 2017.

Is Chennai Metro working in June 2021?

CHENNAI: Chennai Metro Rail Limited has been operating its passenger services from June 21, 2021 after the lockdown imposed by government of Tamil Nadu due to increasing cases of COVID-19. Presently, CMRL is operating its Metro train services with 50% capacity as per the instructions of Government of Tamil Nadu.

Is Metro working in Chennai?

CHENNAI: Chennai Metro Rail Limited has extended its train timings and also increased peak hour services. From Thursday, metro trains will operate from 5.30am to 9pm, and peak hours will be from 8am to 11am and from 5pm to 8pm. At present, an average 47,000 people are travelling every day in metro trains.

Is there a train without a driver?

Since then, ATO technology has been developed to enable trains to operate even without a driver in a cab: either with an attendant roaming within the train, or with no staff on board. The first fully automated driverless mass-transit rail network is the Port Island Line in Kobe, Japan.

What is the cost of Chennai Metro Rail Phase 2?

In February, Metro Rail floated nine tenders for detailed design consultants and for soil tests. In one of the tenders, it has released a map of phase 2 with 104 stations, covering 107km. The estimated cost of the project is Rs 85,047 crore.

Which is the best route of Chennai Metro?

Chennai Metro Routes As of 2021, the metro rail network of Chennai has two operative routes, covering a total distance of 54.15 km. Chennai Metro Route 1: Wimco Nagar to Chennai International Airport (Blue Line) Chennai Metro Route 2: MGR Central (Chennai Central) to St. Thomas Mount (Green Line)

Who is the MD of Chennai Metro Rail?

CMRL officials conducted a trial run on the metro line in the presence of CMRL MD along with Director (Projects) and GC.

Which is the largest underground station in Chennai?

The Chennai Central Metro station spread over 70,000 sq metres, is the largest underground station of the Chennai Metro Rail. According to the Chennai Metro Rail Limited, a plan was also made to apportion some of the underground space to create a parking lot for 1000 two-wheelers and 500 cars.