What is the proposed capacity of Lower Subansiri Hydroelectric Power project?
What is the proposed capacity of Lower Subansiri Hydroelectric Power project?
Subansiri Lower Dam
| Subansiri Lower Project | |
|---|---|
| Total capacity | 1.37 km3 (1,110,677 acre⋅ft) |
| Active capacity | 0.44 km3 (356,714 acre⋅ft) |
| Surface area | 33.5 km2 (13 sq mi) |
| Power Station |
How many power stations are there in Assam?
ONGOING PROJECTS :
| Sl. No. | Project Name | Capacity (MW) |
|---|---|---|
| 1 | Namrup Replacement Power Project (NRPP) | 100 |
| 2 | Lakwa Replacement Power Project (LRPP) | 70 |
| 3 | Myntriang Small Hydro Electric Project (MSHEP) | 10.5(St-I=9St-II=1.5) |
Where is sharavathi hydroelectric project?
How to Reach: Sharavathi Hydro Power Plant is located in the Kargal town of Sagara subdivision of Shimoga District in the state of Karnataka. You can reach this power station via Road, Rail or Air.
Which dam is built on which river?
Major Dams in India
| List Of Major Dams in India | State | River |
|---|---|---|
| Sardar Sarovar Dam | Gujarat | Narmada |
| Nagarjuna Sagar Dam | Telangana | Krishna |
| Hirakud dam | Odisha | Mahanadi |
| Bhakra Nangal Dam | Punjab-Himachal Pradesh Border | Sutlej |
How many NHPC are there in India?
NHPC is operating 22 Power Stations with installed capacity of 5551.2 MW and annual design energy of 23612 MU. Actual Bills raised in respect of these power stations during financial year 2019-20 was ₹ 7642.26 crores. The Power Stations of NHPC are located in Northern, Eastern and North-Eastern regions of the country.
Who is the chairman of NHPC?
Shri Abhay Kumar Singh
Shri Abhay Kumar Singh is the Chairman and Managing Director of NHPC Ltd. He is also the Chairman of Board of Directors of NHDC Limited and Loktak Downstream Hydroelectric Corporation Limited.