What is a ground disturbance permit?

What is a ground disturbance permit?

Ground Disturbance Permit Required A permit is required for work activities defined as ground disturbance and may include a Work Permit or Pre-Job Hazard Assessment as defined by local operating areas.

What is on a ground disturbance checklist?

Perform a hazard and risk assessment. Look for signage and other signs of ground disturbance. Identify hazards associated with specific underground facilities. Determine level of risk associated with the hazard. Determine controls and barriers to eliminate or reduce the risk.

What is considered ground disturbance in Alberta?

What activities are considered ground disturbances? Ground disturbances, as defined under the Pipeline Act, can include excavating, digging, trenching, plowing, drilling, tunnelling, augering, backfilling, blasting, stripping topsoil, levelling, removing peat, quarrying, clearing, grading, and pounding posts.

What are ground disturbers responsible for?

The responsibility for preventing ground disturbance damage to buried facilities is shared by all stakeholders and includes elements such as planning, effective use of the one-call centre, accurate and timely identification, locating and marking of buried facilities, adherence to safe and best ground disturbance …

Is backfilling considered ground disturbance?

Ground disturbances can include, but are not limited to, digging, excavation, trenching, ditching, tunneling, boring/drilling/pushing, augering, topsoil stripping, land levelling/grading, plowing, tree planting, land clearing and stump removal, subsoiling, blasting/use of explosives, quarrying, grinding and milling of …

Who is a critical stakeholder in ground disturbance activities?

The digging community comprises anyone who engages in, or is responsible for, a ground disturbance including, but not limited to: Homeowners. Farmers.

What is ground disturbance level 2?

® This one-day program is designed for any party that is supervising a Ground Disturbance, independently performing a Ground Disturbance, or issuing and receiving Ground Disturbance permits.

How long are line locates valid for in Alberta?

14 DAYS
Alberta One-Call members require a minimum of two full working days notice prior to routine locates. Locate markings are valid up to 14 DAYS (non-business) after being placed.

What is the biggest hazard at a ground disturbance site?

The largest hazards involve energized subsurface utilities, such as electrical, telephone, fiberoptic, water, petroleum, and natural gas conveyance lines. These subsurface utilities can range from domestic feeder systems, to large scale high pressure natural gas supply lines.

What are the responsibilities of a ground disturbance worker?

Explain relevant ground disturbance regulations. Maintain compliance with appropriate permits, licenses, approvals, and agreements. Deploy appropriate safety precautions related to ground disturbance. Identify and prevent interference with buried/underground facilities.

Who do ground disturbers need to send notifications to?

Alberta One-Call requires anyone planning to disturb the ground in Alberta to communicate a request to the owners and operators of buried facilities in Alberta, who are members of the Corporation. The notification (ticket) is sent out to facility owners or the companies that represent them.

What is the best practice regarding the lifespan of locates?

Now locate tickets are valid for the full 30 days from the date they are issued (unless otherwise stated on the locate ticket). Some utilities, including pipelines and other high-pressure lines, will continue to have 14-day locates, after which time the locates must be refreshed before work can continue.

When do you need an IRP for a truck?

Out-of-state carriers MUST secure a Trip Permit prior to entering any state other than their base state. The Trip Permit must remain with the vehicle at all times while active. Any vehicle NOT in compliance with the following WILL need a IRP Trip Permit: Your truck or tractor is operating within its base state.

Which is the only registration required by IRP?

The base jurisdiction issues the IRP apportioned license plate and IRP cab card. Since the IRP cab card will list all jurisdictions in which you have paid registration fees, it is the only vehicle registration required to operate interstate or intrastate in IRP jurisdictions.

What are the changes to IRP 21 ( 2017 )?

IRP 21 (2017) represents a revised version of the sanctioned IRP 21 (2010), following a limited scope review. The key revisions include reformatting to match the current style guide, updated references, and most importantly, a revision of the Well Servicing Pressure Categories. Hazard and Risk Assessment Register – Risk Register.

What is the scope for a ground disturbance?

to assure that a safe work process is in place before performing a ground disturbance (i.e., excavation). Scope This procedure is applicable to all Suncor Energy Inc., Oil Sands employees, contractors, and vendors; and encompasses all ground disturbance activities affecting Suncor Energy